Three things about a permit consultant can be checked before any money changes hands: whether the person who will sign the drawings appears on the ETEK register in the speciality the project needs, whether the quoted fee covers both permissions rather than only the first, and whether the practice has carried a comparable project through to the certificate of final approval. Everything else in a pitch is assertion.

What can actually be verified

Cyprus separates two questions that applicants tend to merge. Whether something may be built on a particular plot is decided by the planning authority. Whether the thing that has been permitted is properly designed and safe to construct is decided by the district local authority, on the basis of certified drawings and calculations. Two files, two clocks, one after the other.

The recorded typical durations — 150 days for planning permission and 120 days for the building permit — are the honest starting point for any programme. They run consecutively, not in parallel, and they run from the point at which the authority treats the file as complete rather than from the day it was lodged. A consultant has no control over the first number and considerable control over when it starts.

Against that, four things are checkable in advance:

  • Register status. ETEK maintains the register of architects, civil engineers and the other technical specialities. Drawings submitted without a registration number on them do not get assessed. The register is public, and the number on a quotation should match the person who will sign.
  • Speciality. Registration in one speciality is not registration in all of them. An architect signs architectural drawings; structural calculations require a civil engineer; a town planning speciality is a different entry again. A single-name practice offering all of it is describing a team it may or may not have.
  • Scope of the appointment. Whether the fee ends at the planning grant, at the building permit, or at the certificate of final approval is a matter of written scope, not of goodwill.
  • Comparable work. Whether the practice has taken an extension, a change of use or a new dwelling through the same district local authority is a factual question with a factual answer.

What cannot be verified is the outcome, the decision date, or the quality of a relationship with an officer. Practices are listed on the planning and permits pages by documented specialism and register status, by district. No opinions about individual firms are published, because there is no defensible basis on which to publish them.

Registrations that matter

The ETEK register is the gate. It covers individuals, and engineering and architectural companies are registered in their own right, so a practice trading as a limited company should be able to state both its own registration and the registration of the person signing.

Beyond that, three registrations or appointments recur on domestic files:

The structural design must come from a civil engineer registered in that speciality. On a straightforward single-storey extension this may be a modest appointment; on anything cut into a slope it is not, and treating it as a line item to be squeezed produces the calculations that get sent back.

The energy performance study is a separate technical deliverable prepared by a qualified assessor. It is part of the building permit file rather than an optional extra, and it is one of the more common omissions when a fee has been priced down to win the work.

Consultation with other authorities applies to a minority of plots and dominates the timeline when it does. Proximity to declared monuments, environmentally designated land, coastal setback lines and forest boundaries each pull in a consultee whose response time sits outside the planning authority's own clock. Establishing at the outset whether a plot triggers any of these is a pre-application question, and a consultant who has looked at the local plan for that specific parcel can answer it.

Questions to ask

The questions below separate a scoped appointment from an optimistic one. They are worth asking in writing, because the answers become the scope.

  • Which ETEK speciality is the signing professional registered in, and what is the registration number?
  • Does the fee cover planning permission and the building permit, or the planning application alone?
  • Is a pre-application check on the local plan for this plot included before drawings are produced?
  • Who prepares the structural calculations and the energy performance study, and are those appointments inside the fee or alongside it?
  • How many rounds of response to authority comments are included before additional fees apply?
  • Are authority fees, survey costs and copies inside the quoted figure or treated as disbursements?
  • Who lodges the file, and who is the named contact with the district local authority?
  • If a design amendment becomes necessary during construction, how is that charged?
  • Does the appointment run through to the certificate of final approval, and what is required from the consultant at that stage?

The last one carries more weight than it looks. The certificate of final approval confirms that what was built matches what was permitted, and it sits on the critical path to the title deed. A file left short of it is a problem deferred to the point of sale.

What a good quote looks like

The recorded ranges for permit work in Cyprus are wide because the deliverable varies more than the profession does.

The midpoint sits around €2,400 per application for drawings and submission on a domestic extension, with recorded quotes running from roughly €1,200 to €5,500. Where a project lands inside that range is driven by a handful of things that can be established before anyone quotes:

  • Whether a current topographic survey and a clean title exist, or whether the boundary has to be resolved first.
  • Whether the plot triggers consultation with another authority.
  • Ground conditions. In parts of Pissouri, where ground movement is a known feature of the village, a structural survey ahead of major work is standard practice rather than a precaution, and the design effort reflects that.
  • Access. On hillside plots around Peyia, steep access roads limit crane and delivery vehicle size, which changes the construction method the drawings have to describe.
  • Whether the building is being altered or replaced, and whether existing approved drawings can be located.

A quote worth comparing states the deliverables as a list — site plan, floor plans, sections, elevations, structural set, energy study — names the authority each file goes to, separates disbursements, and ties payment to stages: appointment, planning submission, planning grant, building permit issue, final approval. Two quotes with the same headline figure and different stage structures are not the same offer.

Warning signs

Common questions

Are both planning permission and a building permit required?

For most construction, extension and change-of-use work, yes, and in that order. Certain minor works fall under exemption orders. Whether a specific project does is a question for the pre-application stage, established against the local plan for that plot rather than by analogy with a neighbour's project.

Who issues the building permit?

The district local authority for the area, rather than the individual municipality. Planning permission comes from the Department of Town Planning and Housing. Two authorities, two files, and a consultant should be able to name the office each one goes to.

How long does the whole process take?

The recorded typical durations are 150 days for planning permission and 120 days for the building permit, running consecutively. Add the design period before submission and the response time to any request for further information. The variable an applicant controls is whether the file is complete on the day it is lodged.

Can a consultant accelerate the authority?

No. What a consultant influences is the completeness of the submission, the speed of response to comments, and whether an issue that could have been identified at pre-application stage surfaces after a refusal instead.

Are authority fees included in a consultant's quote?

Usually not. Statutory fees are typically treated as disbursements paid by the applicant, which is reasonable — the point is that the quotation should say so rather than leave the applicant to discover it.

What happens if construction departs from the approved drawings?

The deviation has to be regularised before the certificate of final approval can be issued, and the certificate is a precondition for the title deed. Amendments handled during construction are administrative. The same deviation discovered at final approval is expensive.

How are permit practices listed here?

By vertical, district and documented specialism, drawn from register data. The district pages under areas show who covers each district, and the practice area index lists the other professional services this site covers. Rankings by quality and opinions about individual firms are not part of it.

Planning and permit practices by district

8 companies covering this area.

  • CyRIC

    Makedonitissa, Nicosia

    CyRIC is an engineering practice in Makedonitissa, in the Nicosia district. Recorded services include structural calculations, surveys, certificates.

    • Structural calculations
    • Surveys
    • Certificates
  • Polart Construction

    Strovolos Iii, Nicosia

    Polart Construction is an architecture practice in Strovolos Iii, in the Nicosia district. Recorded services include planning submissions, drawings, site supervision.

    • Planning submissions
    • Drawings
    • Site supervision
  • Karyatides

    Strovolos, Nicosia

    Karyatides is an architecture practice in Strovolos, in the Nicosia district. Recorded services include planning submissions, drawings, site supervision.

    • Planning submissions
    • Drawings
    • Site supervision
  • Lordos Architects

    Tabakhane, Nicosia

    Lordos Architects is a company in Tabakhane, in the Nicosia district.

  • Andreas Vlittis

    Paralimni, Famagusta

    Andreas Vlittis is an architecture practice in Paralimni, in the Famagusta district. Recorded services include planning submissions, drawings, site supervision.

    • Planning submissions
    • Drawings
    • Site supervision
  • Nicolaides Viana Partnership

    Limassol Centre, Limassol

    Nicolaides Viana Partnership is an architecture practice in Limassol Centre, in the Limassol district. Recorded services include planning submissions, drawings, site supervision.

    • Planning submissions
    • Drawings
    • Site supervision
  • P. A. Constructions Ltd. is an architecture practice in Engomi, in the Nicosia district. Recorded services include planning submissions, drawings, site supervision.

    • Planning submissions
    • Drawings
    • Site supervision
  • Andreas S. Hadjizacharias Ltd

    Agios Nikolaos, Limassol

    Andreas S. Hadjizacharias Ltd is an architecture practice in Agios Nikolaos, in the Limassol district. Recorded services include planning submissions, drawings, site supervision.

    • Planning submissions
    • Drawings
    • Site supervision

Sources

  1. Cyprus Scientific and Technical Chamber (ETEK) — register of members — retrieved 2026-07-28
  2. Department of Town Planning and Housing — planning permission — retrieved 2026-07-28

Thinking of doing this?Get up to five quotes, free.

Tell us what the matter concerns and we will put you in touch with qualified advisers in your district.

Get up to 5 quotes.Free, with no obligation.

Tell us briefly what you need. We gather quotes from qualified companies where you live, so you do not have to ring round yourself.

Free · No obligation · You decide whether to go ahead